HC Deb 26 January 2001 vol 361 c747W
Angela Smith

To ask the Secretary of State for Education and Employment if he will list the schools in the Basildon parliamentary constituency which have received funding under the New Deal for Schools since May 1997, showing the amount of funding in each case. [147392]

New Deal for Schools Allocations to schools in the Basildon constituency
Year/School Project details Grant awarded (£)
1997–98
Included within LEA wide package:
Woodlands school Improvement of science block 11,170,000
Nicholas school (now James Hornsby High school) Refurbishment
1998–99
Seven school package LEA wide Replacement of ageing boilers 1384,800
Eight school package LEA wide Replacement of ageing boilers 1379,750
Orsett CE (VA) Primary school Playground reconstruction 50,800
1999–2000
Five school package LEA wide Energy management scheme 12,947,000
Bulphan CE (VC) Primary school Replacement of boiler plant 56,500
2000–01
Included within a 29 school package:
St. Anne Line Catholic Infant and Junior schools (VA) Boiler replacements 11,610,355
Included within a six school package:
James Hornsby High school Remedying structural defects 1353,535
Included within a three school package:
Lincewood Infant school Asbestos removal 1141,578
Lincewood Junior school
Included within a four school package:
Swan Mead Junior school Sewage pumping station plant renewal 137,650
Vange Primary school Extension to replace substandard accommodation 768,163
Included within a six school package:
De La Salle School RC (VA) Resurface/reconstruct paving 1230,888
Gable Hall Secondary school Replacement of boilers and plant 54,294
Hassenbrook Secondary school Replacement of boiler, plant, main and sports hall 276,936
Abbots Hall Junior school Replacement of boiler and plant 45,254
Giffards Junior school Rewiring 70,368
St. Clere's Secondary school Roof insulation 17,852
Abbots Hall Infant school Rewiring 72,939
Orsett CE (VA) Primary school Resurface car park and roadway 12,224
Stanford-le-Hope Infant school Tarmac pedestrian paths 20,383
Giffards Junior school Doors and windows 24,801
Stanford-le-Hope Infant school Boiler house refurbishment 22,654
Arthur Bugler Junior school Refelt Durox roof 72,804
1 Allocations made to package projects to Essex local education authority, which will be able to advise the value of projects at schools in the Basildon constituency which benefited from these allocations.

Forward to