HC Deb 28 July 2000 vol 354 cc928-31W
Mr. Jenkin

To ask the Secretary of State for the Environment, Transport and the Regions (1) what the expected start date is for(a) the A27 Southerham-Beddington improvement, (b) the M23 junctions 8 to 9 widening, (c) the M25 junctions 15 to 16 widening, (d) the M25 junctions 16 to 19 widening, (e) the M4 junction 4B to 8/9 widening, (f) the A2 Lydden-Dover improvement, (g) the A3 Hindhead improvement, (h) the A21 Tonbridge-Pembury dualling, (i) the A27 Wilmington bypass and (j) the A27 Selmeston bypass; [133495]

(2) what the expected start date is for (a) the M5 junctions 17 to 21 widening, (b) the A31 Poole link road, (c) the A36 Codford-Heytesbury improvement, (d) the A30/A303 Marsh Honiton and A35 Honiton Eastern bypass, (e) the A38 Saltash-Stoketon Cross improvement, (f) the A38 Dobwalls bypass, (g) the A303 Ilminster to Marsh improvement, (h) the A303 Sparkford to Ilchester improvement, (i) the A303 Wylye-Stockton Wood improvement and (j) the A303 Chicklade Bottom-Mere improvement; [133496]

(3) what the expected start date is for (a) the A27 Arundel bypass, (b) the A259 Pevensey to Bexhill improvement, (c) the A259 Bexhill and Hastings western bypass, (d) the A205 Catford Town Centre improvement, (e) the A4 Henlys/Waggoners' Corner improvement, (f) the A406 Bounds Green-Green Lanes improvement, (g) the A406/ A1/A598 Regents Park Road junction improvement and (h) the A406 Golders Green Road junction improvement; [133542]

(4) what the expected start date is for (a) the M1 Junctions 31–32 widening, (b) the M62 East-M606 link roads, (c) the A 1(M) Redhouse Ferrybridge improvements, (d) the A63 Castle Street (Hull) improvement, (e) the A49 Hereford bypass, (f) the M6 junctions 11A-16 widening, (g) the M42 junctions 3A-7 widening, (h) the A43 Geddington bypass, (i) the A43 Moulton-Broughton improvement, (j) the A43/A16 Stamford Relief Road and (k) the A45 Weedon Flore/Upper Heyford bypass; [133501]

(5) what the expected start date is for (a) the Al Gateshead Western Bypass improvement, (b) the M60 junctions 12 to 18 improvements, (c) the M62 junction 6 improvements, (d) the A6(M) Stockport North/South bypass, (e) the A555 Poynton bypass, (f) the A523 Poynton bypass, (g) the A555 Manchester Airport Link west road scheme, (h) the A570 Ormskirk bypass, (i) the A595 Parton-Lillyhill improvement, (j) the A65 Gargrave bypass, (k) the A65 Hellifield and Long Preston improvement and (l) the A650 Hard lngs improvement; [133499]

(6) what the expected start date is for (a) the A46 Newark-Widmerpool improvement, (b) the M1 junctions 25 to 28 junction improvements, (c) the M1 junctions 23A to 25 widening (including A6 to M1 link), (d) the Ml junctions 21A to 23A widening, (e) the A38 Derby Ring Road, (f) the A61 grade-separated junction, (g) the A52/A5111 grade-separated junction, (h) the A453

Trunks roads in England
PQ/133495
(a) A27 Southerham-Beddington Improvement Withdrawn—Southampton to Folkestone Study
(b) M23 Junctions 8 to 9 Widening Gatwick Area Study
(c) M25 Junctions 15 to 16 Widening London Orbital Study
(d) M25 Junctions 16 to 19 Widening London Orbital Study
(e) M4 Junction 4B to 8/9 Widening London and Reading Study
(f) A2 Lydden-Dover Improvement Next round of RPG
(g) A3 Hindhead Improvement A3 Hindhead Study
(h) A21 Tonbridge-Pembury Duallng Access to Hastings Study
(i) A27 Wilmington Bypass Southampton to Folkestone Study
(j) A27 Selmeston Bypass Southampton to Folkestone Study
PQ/133496
(a) M5 Junctions 17 to 21 Widening Withdrawn—London to South West Study and South Wales Study
(b) A31 Poole Link Road Withdrawn, to be detrunked
(c) A36 Codford-Heystesbury Improvement Withdrawn, to be detrunked
(d) A3O/A3O3 Marsh Honiton and A35 Honiton Eastern Bypass London to South West Study
(e) A38 Saltash-Stoketon Cross Improvement London to South West Study
(f) A38 Dobwalls Bypass London to South West Study
(g) A3O3 Illminster to Marsh Improvement London to South West Study
(h) A3O3 Sparkford to Ilchester Improvement London to South West Study
(i) A303 Wylye-Stockton Wood Improvement London to South West Study
(j) A303 Chicklade Bottom-Mere Improvement London to South West Study
PQ/133497
(a) M11 Junction 5 North-facing Slip Road Improvement Withdrawn—problem for RPC
(b) Ml Junctions 10 to 14 Widening Withdrawn—London to South Midlands Study
(c) Ml1 Junctions 8 to 9 Widening Withdrawn—London to South Midlands Study
(d) All Fiveways to Thetford Improvement In TPI—Subject to Statutory Procedures (Public Consultation)
(e) All Attleborough Bypass In TPI—Subject to Statutory Procedures (Public Consultation)
(f) Ml Junctions 6A to 10 Widening London to South Midlands Study
(g) M1 1 Junction 14 Improvement Cambridge-Huntingdon Study—considered by RPC
(h) A1(M) Junctions 6 to 8 Widening London to South Midlands Study—considered by RPC
(i) A5 Dunstable Eastern Bypass London to South Midlands Study—considered by RPC
(j) A14/M11 Junction 14 to Ml/A1 Link Improvement Cambridge to Huntingdon Study—considered by RPC
PQ/133499
(a) Al Gateshead Western Bypass Improvement Tynesdie Area Study
(b) M60 Junctions 12 to 18 Improvements M60 12–18 Study
(c) M62 Junction 6 Improvements Withdrawn—RPC to consider
(d) A6(M) Stockport North/South Bypass Withdrawn—to be detrunked

Clifton-M1 improvement, (i) the A453 Clifton Lane improvement, (j) the A47 Hardwick roundabout flyover and (k) the A428 Norse Road link; [133506]

(7) what the expected start date is for (a) the M11 junction 5 north-facing slip-road improvement, (b) the M1 junctions 10 to 14 widening, (c) the M11 junctions 8 to 9 widening, (d) the All Fiveways to Thetford improvement, (e) the A 11 Attleborough bypass, (f) the M1 junctions 6A to 10 widening, (g) the M11 junction 14 improvement, (h) the A1(M) junctions 6 to 8 widening, (i) the A5 Dunstable eastern bypass and (j) the A14/M11 junction 14 to M1/A1 link improvement. [133497]

Mr. Hill

I have asked the Chief Executive for the Highways Agency to write to the hon. Member.

Letter from Peter Nutt to Mr. Bernard Jenkin, dated 28 July 2000I have been asked by the Transport Minister, Keith Hill, to reply to your recent parliamentary Questions about the start dates for various road schemes. The start dates for most of the schemes are subject either to the outcome of statutory procedures or to decisions following studies announced in the Government's White Paper, "A New Deal for Trunk Roads in England". The White Paper also withdrew some schemes because they were on roads which were to be detrunked, or because they were to be replaced by smaller scale schemes. Details for each scheme are given in the enclosed table, and are arranged according to the order in which you requested them.

Trunks roads in England
(e)-(f) A555 Poynton Bypass/A523 Poynton Bypass Withdrawn—to be detrunked
(g) A555 Manchester Airport Link West Road Scheme Withdrawn—to be detrunked
(h) A570 Ormskirk Bypass Withdrawn—to be detrunked
(i) A595 Parton-Lillyhill Improvement Withdrawn—to be detrunked
(j) A65 Gargrave Bypass Withdrawn—to be detrunked
(k) A65 Hellifield and Long Preston Improvement Withdrawn—to be detrunked
(l) A650 Hard Ings Improvement Withdrawn—Smaller scale solution
PQ/133501
(a) Ml Junctions 31–32 Widening HA to consider smaller scale option
(b) M62 East-M606 Link Roads To be considered by RPC
(c) A1(M) Redhouse Ferrybridge Improvements South and West Yorkshire Motorway Box Study
(d) A63 Castle Street (Hull) Improvement Hull Study
(e) A49 Hereford Bypass Withdrawn—RPC to consider
(f) M6 Junctions 11A-16 Widening West Midlands to North West Conurbation Study
(g) M42 Junctions 3A-7 Widening West Midlands Area Study
(h) A43 Geddington Bypass Withdrawn—to be detrunked
(i) A43 Moulton-Broughton Improvement Withdrawn—to be detrunked
(j) A46/A16 Stamford Relief Road Withdrawn—to be detrunked
(k) A45 Weedon Flore/Upper Heyford Bypass Withdrawn—to be detrunked
PQ/133506
(a) A46 Newark-Widmerpool Improvement Withdrawn—RPC to consider
(b) M1 Junctions 25 to 28 Junction Improvements North South East Midlands Study
(c) M1 Junctions 23A to 25 Widening (including A6 to M1 Link) North South East Midlands Study
(d) M1 Junctions 21A to 23A Widening North South East Midlands Study
(e) A38 Derby Ring Road A38 Derby Junction Study
(g) A52/A5111 Grade-Separated Junction A38 Derby Junction Study
(h) A453 Clifton-M1 Improvement A453 Ml Nottingham Study
(i) A453 Clifton Lane Improvement A453 M1 Nottingham Study
(j) A47 Hardwick Roundabout Flyover Withdrawn—Smaller scale solution
(k) A428 Norse Road Link Withdrawn—Problem for RPC
PQ/133542
(a) A27 Arundel Bypass Southampton to Folkestone Study
(b) A259 Pevensey to Bexhill Improvement Access to Hastings Study
(c) A259 Bexhill and Hastings Western Bypass Access to Hastings Study
(d) A205 Catford Town Centre Improvement Withdrawn—to be detrunked
(e) A4 Henlys/Waggoners' Corner Improvement Withdrawn—small scale solution
(f) A406 Bounds Green-Green Lanes Improvement Withdrawn—to be detrunked
(g) A406/A1/A578 Regents Park Road Junction Improvement Withdrawn—to be detrunked
(h) A406 Golders Green Road Junction Improvement Withdrawn—to be detrunked