§ Mr. EvansTo ask the Secretary of State for the Environment, Transport and the Regions how many miles of new roads were built in the Ribble Valley constituency in each year from 1994 to 2000. [132719]
§ Mr. HillNew highway construction (includes realignment and dualling) in the Ribble Valley constituency in each year from 1994 to 2000 is as follows:
Miles 1994 1995 1996 1997 1998 1999 2000 A1 0.00 0.00 0.00 3.50 0.00 0.00 0.00 B 0.00 0.00 0.00 2.14 0.00 0.00 0.00 C 0.00 0.00 0.00 0.00 0.00 0.83 0.00 Footway 0.12 0.48 0.53 0.00 0.00 0.09 0.00 Motorway 0.00 4.62 0.00 0.90 0.00 0.00 0.00 Trunk road 0.00 2.13 0.00 0.08 1.02 2.31 0.00 Unclassified 0.31 1.32 0.63 0.96 1.55 2.15 0.22 Unadopted 1.25 0.41 0.69 0.00 0.81 1.56 1.23 1 Principal