§ Mr. TippingTo ask the President of the Board of Trade if he will list(a) the bids that were successful under non-fossil fuel obligations 1 and 2, (b) those projects that are now operational and (c) those projects that are currently under construction. [29907]
§ Mr. PageThe status of individual contracts is a commercial matter for the parties to the contracts—the Non-fossil Purchasing Agency Ltd. as agent of the 12 regional electricity companies, and the generators. The Department does not hold information on projects under construction. Aggregate information on projects that were awarded contracts under the first and second renewables orders—SI 1990/1859 and SI 1991/2490 respectively—and on projects that were operational as at 31 March 1995, is as follows:
574W
Contracted Projects Operational Projects Technology Number Capacity MW (DNC) Number Capacity MW (DNC) NFFO-1(1990) Hydro 26 11.851 21 10.001 Landfill Gas 25 35.496 20 31.676 MIW 4 40.63 4 40.63 Other 4 45.48 4 45.48 Sewage Gas 7 6.445 7 6.445 Wind 9 12.211 8 11.703 Total: 75 152.113 64 145,935 NFFO-2(1991) Hydro 12 10.857 7 10.052 Landfill Gas 28 48.449 26 46.393 MIW 10 271.48 2 31.5 Other 4 30.15 1 12.5 Sewage Gas 19 26.859 19 26.859 Wind 49 84.431 25 51.909 Total: 122 472.226 80 179.213 Total (NFFO-1+2): 197 624.339 144 325.148 Source: Energy Technology Support Unit.