HC Deb 22 February 1993 vol 219 cc446-55W
Ms. Mowlam

To ask the Secretary of State for Education where he intends to hold conferences on grant-maintained status for schools; and if he will provide details of the target audience and costs, including the cost of publishing and distributing literature for those conferences.

Mr. Forth

Conferences for headteachers and governors of local education authority maintained schools are planned for Nottingham and Birmingham. The conference literature comprises a letter of invitation and a copy of the standard grant-maintained information pack. The unit cost of producing the information packs is 79p. Mailings of invitations and packs fall within the terms of the contract with the departmental despatch centre and therefore costs cannot be identified separately. The cost of conference accommodation and facilities is expected to be approximately £6,700 for each event. Specialised support services for each conference are likely to cost around £6,500. Further conferences will be held across the country to meet demand.

Ms. Mowlam

To ask the Secretary of State for Education if he will provide a breakdown on the costs, including the cost of publication and distribution of promotional literature, of the "Going Grant-maintained Conference" held on 10 and 11 February in Newcastle.

Mr. Forth

The conference material for the two one-day events held in Newcastle comprised a letter of invitation and a copy of the standard grant-maintained information pack. Production costs of the information packs were approximately £2,600. The mailing of invitations and packs fell within the terms of the contract with the departmental despatch centre and distribution costs cannot be identified separately. The total costs for conference accommodation and facilities were approximately £12,300. Specialised support services for the two conferences cost approximately £11,000.

Mr. William Powell

To ask the Secretary of State for Education if he will list the approved capital allocations for grant-maintained schools for the year 1993–94.

Mr. Forth

The information requested is contained in the following tables. Table A lists those self-governing state schools (grant-maintained schools) operating as at

Table A
Grant-maintained school's capital bids 1993–94 allocations
School Project £ thousand
Avon
Beechen Cliff Urgent drainage and subsidence prevention work 139
Oldfield 2 new science laboratories and preparation rooms 200
Barnet
Hendon Extension and provision of additional science technology and maths facilities 420
Bedfordshire
Manshead High Replace oil with gas central heating system 110
Queensbury Improvements to science and technology facilities 120
Berkshire
Denefield New science laboratory 55
The Downs New laboratory and classrooms to replace mobiles 320
Herschel Fire precaution works including alarm system 130
Langley Grammar Extension for 2 science laboratories with prep, rooms 210
Priory Combined Resources unit, 4 classrooms and toilets for physically disabled children 275
Southlands (Reading) Re-roofing 15
Bexley
Barnehurst Infants 2 new classrooms to replace mobiles 90
Barnehurst Junior 1 new classroom to replace mobile 50
Birmingham
Baverstock Roofing works; repairs and replacement 42
Great Barr Fire prevention work to the 4-storey block 300
Handsworth 2 new technology rooms 184
Small Heath Replace heating boiler and controls 55
Bolton
Crompton Fold New classroom and changing room to replace temporary accommodation 90
Repairs to heating system 95
Bradford
Bingley Phase 2 of science wing 250
Brent
Claremont High Refurbish home economics and CDT accommodation 150
Phase 2: Science wing 350
Copland Convert and refurbish 4 science laboratories 150
Bromley
Beaverwood New technology block 277
Bullers Wood Provision of 5 new laboratories 214
Charles Darwin Phase 3: Rewiring of school 162
Coopers New technology block 221
Crofton Junior New science room 55
Hayes Refurbish science accommodation and health and safety work 146
Kelsey Park New technology block 315
Langley Park Remodel and refurbish craft block 100
Newstead Wood New technology block 267
Ravenswood Boys Technology extension and upgrade existing 246
Buckinghamshire
Beaconsfield Re-roof main building 190
Bridgewater Hall Improvements to science and technology 128
Bridgewater Hall Replace shared boiler 200
With Brindley Hall
Chalfonts 2 new science laboratories plus preparation rooms 305
Calderdale
Crossley Heath Laboratory refurbishment 225
North Halifax Essential cladding repairs 125

the end of December 1992 which are to receive a capital grant allocation for 1993–94. Table B shows the allocations made to these schools under the technology schools intiative. Schools which became self-governing state schools on 1 January 1993 were invited to submit bids by 25 January 1993 for named capital projects and for resources under the technology schools initative. Decisions on the allocations for these schools have not yet been made.

School Project £ thousand
Salterlee Primary Urgent health and safety work 40
Cambridgeshire
Bassingbourne Reorganisation and refurbishment to provide technology facilities 136
Gamlingay Village New classrooms to replace 4 temporary classrooms 185
Remodel science and technology facilities 137
Park Lane Primary Re-roof 80
Queens Science department extension 300
St. Helen's Primary Replace mobiles with 2 classrooms and toilets 120
Cheshire
Bankfield Part re-fenestration 300
Croydon
Riddlesdown Health and safety works 400
Cumbria
Hayton Alterations and extension to replace temporary accommodation 170
Kirkbie Kendal Phase 1: Science/technology facilities 950
Queen Katherine Roof and cladding repairs to 2 blocks 50
St. Aidan's Re-model and refurbish science laboratories 150
Trinity Refurbishment of science laboratories 150
Re-model technology suite and 1 classroom 198
Derbyshire
Borrow Wood Junior Health and safety improvements 65
Resource area and circulation improvements 45
Ecclesbourne Phase 2: Technology block 260
Netherthorpe Replace temporary accommodation with modern language block 200
Dorset
Avonbourne Improvements to existing technology and science departments 220
Bournemouth School for Girls 4 new science laboratories 350
Budmouth Refurbish 7 science laboratories plus preparation rooms 370
Highcliffe Health and safety improvements 75
Parkstone Grammar Remodel and refurbish science and technology facilities 500
Woodrofle Refurbish 3 science laboratories 150
Ealing
Drayton Manor Repair and upgrade art and technology roof 77
Ellen Wilkinson Window replacement in tower block 105
Remodelling to provide 2 additional laboratories 95
Greenford High Re-roof CDT, home economics and art block 165
Essex
Beauchamps Boiler replacement and energy conservation 118
Boswells New technology block and refurbish technology and classrooms 350
Bromsford Major repairs and remedial works 243
Chalvedon Phase 3: Middle school refurbishment and extensions 300
Chelmsford Girls New science department 500
Eastwood Re-model and refurbish technology block 120
Elmwood Primary Provide 4 new classrooms and hall and extend reception area 340
Furthenvick Park Replace boiler, hot and cold storage and E.M.S. 145
Great Totham Primary Demolish temporary classroom, and conversion of existing accommodation 75
Katherines Primary Conversion of teaching areas 75
King Edward VI Replace temporary accommodation with new technology/art block 270
King Harold Re-roofing and renew curtain wall sealing 155
King John Refurbish 4 laboratories and preparation rooms 188
North Crescent Primary 3 new classrooms 180
Northlands Junior Essential perimeter security fencing 35
Philip Morant Conversion to provide 3 laboratories 120
Plume Re-model upper school design and technology block 148
Rickstones Refurbish technology accommodation 50
Saffron Walden Replace asphalt roofs and parapets 388
Thurstable Re-model and extend technology 200
Torells Refurbish technology 185
Westcliff Boys 2 new science laboratories 170
Gloucestershire
Balcarras Re-roofing part of school 80
Chosen Hill Remodelling to form 3 science laboratories and preparation rooms 195
Cotswold Replace heaters and insulation in the ROSLA block 42
Crypt Refurbishment of science and technology facilities 190
Katherine Lady Berkeley Major roof repairs 161
Marling New science block and adaptations and demolition of some existing accommodation 475
Newent Community Refurbish 3 home economics rooms 150
Refurbish science laboratories 90

School Project £ thousand
Pates Replacement buildings: Part phase 3 and phase 4 500
Rednock New building to provide 2 science laboratories and 4 classrooms 650
Ribston Hall High Replace glazed aluminium cladding to 3-storey block 198
Robinswood Primary Replace school roof finish 27
Rewire and update electrical installation 72
Tewkesbury Replacement and rationalisation of heating and hot water services 259
Hampshire
Burgate 2 new science laboratories and preparation rooms 230
City of Portsmouth Refurbish 4 science laboratories 120
Crofton New block containing new science laboratories to replace temporary accommodation 450
Hardley New heating system to Butler block 145
Hertfordshire
Christchurch New classroom to replace mobile 71
Francis Bacon Refurbish science laboratories 120
Up-grade fire resistance 68
Parkside First Internal alterations and repairs 141
Parmiters 6 new classrooms and 2 new laboratories 400
Rickmansworth New art and design block 440
Remove asbestos, reclad and reroof (excluding VI Form block) 120
St. Mary's Primary Refurbish toilets 30
Hillingdon
Bishopshalt Replace old boiler with gas heating system 46
Haydon New technology block and refurbish existing technology and classrooms 270
Hayes Manor Fire protective ceilings and ventilation—West building 130
Mellow Lane Major repairs and health and safety work (part only) 302
Northwood Re-roofing and repairs to rainwater goods 136
Queensmead New technology block and re-model technology provision 300
Uxbridge High Phase 1: roof repairs 310
Humberside
Wold Newton Additional new classroom 54
Kensington
Cardinal Vaughan New technology building 300
Kent
Angley Remodelling of design and technology department 330
Archbishops Conversion of workshop to laboratories and provision of CDT rooms and classrooms 640
Aylesford Phase 2: New technology and art block 345
Borough Green 2 additional infant classrooms 95
Bradbourne Technology provision 55
Canterbury High New block of laboratories and toilets 218
Chatham Girls New technology block 216
Cornwallis Refurbish science laboratories 300
Cranbrook Refurbish English and History accommodation 46
Dartford Girls New technology block and adaptations to provide IT facility 280
Holy Trinity Primary Classroom renovation 19
Mailing Re-model technology accommodation 285
Maplesden Noakes Replace central heating boiler plant in each block 200
Conversion to science and technology room 75
Meopham Gas supply and new heating system 200
Minster College Refurbish technology facility 364
Rainham Mark Adaptations to science block 200
Robert Napier New technology accommodation 358
St. Georges (Gravesend) Alternative means of escape 40
Senacre New technology block and remodelling of existing 230
Simon Langton Remodelling to create art, design and technology centre plus new workshops 370
Sir Roger Marwood Extension and improvements to laboratories 400
Skinners Technology building 200
Snodland Primary New classroom block to replace mobiles 200
Thames view Asbestos removal and boiler replacement 95
Wilmington Boys Science block refurbishment 200
Kirklees
Heckmondwike Phase 2: Repairs to old block 189
Additional technology accommodation and conversion 266
Lancashire
Bacup and Rawtenstall Technology and science laboratory 35
Clitheroe Royal New classrooms and improvements to science 400
Lancaster Royal Grammar 2 classroom block 122
Replacement of heating and domestic water system 46
Newton Bluecoat New changing rooms, medical inspection room and disabled toilet 55

School Project £ thousand
Lincolnshire
Ancaster High Roof conversion 50
Bourne Abbey Primary 2 additional classrooms, new science/technology room and toilets 200
Caistor New rooms for design/technology and IT 260
Carres Reroofing laboratory and main teaching blocks 67
Castle Hills Extension of technology block and science laboratory alterations 350
Ermine Junior New science and technology classrooms 50
Gartree Additional science laboratory and fire exit 130
Gleed Girls Phase 1 of technology/science improvements 181
Kings (Grantham) New science/IT block 385
Lincoln Christ Hospital Demolish temporary accommodation and extend technology/science facilities 199
Magdalen Heating system 65
North Kesteven Re-wiring of lower school block 175
Partial re-roofing 125
Queen Elizabeth (Alford) New science and technology extension to replace temporaries 370
Queen Elzabeth (Horncastle) Re-roofing—single storey Vic Hallam block 77
Rauceby Extension to provide classrooms, resource facilities and toilets 170
Robert Pattinson New science laboratories and re-model technology unit 500
St. George's (Sleaford) Two new double classroom blocks to replace temporaries 200
Replacement of 2 mobiles 200
Skegness Replace temporary classrooms with new teaching block including technology provision 600
William Farr Refurbishment of computer room science laboratories and new classrooms 160
Liverpool
St. Francis Xavier New general and technical rooms 600
Norfolk
Acle High Conversion to provide technology facilities 145
Single classroom extension 50
Costessey High Extension to provide 2 science laboratories 200
Cromer High Improvements to technology facilities 205
Dereham First New classroom 60
Gresham Village Three classroom extension and refurbishment of existing accommodation 225
Heacham Middle New technololgy room 50
Marshland High Extension and adaptations to technology suite 235
Norwich Road Roof renewal of main block 121
Renewal of main boiler 45
Robert Kett Repairs to roof and chimneys 75
Sheringham High Refurbish existing technololgy facilities 270
West Flegg Middle Two new classrooms to replace mobiles 130
Wymondham College Technology centre to replace temporary accommodation 261
Northamptonshire
King John, Northants Replace slate roof and repair curtain walling 45
Kingswood Replacement of main heating system 126
Lodge Park Replacement of mobiles by new building 470
Moulton Primary Phase 3: Replace of 4 mobiles 199
Northampton Boys Refurbish 5 laboratories and repair works 280
Southfield Girls Repairs to concrete frame, flat roofs and toilets 162
Nottinghamshire
Ravensdale Middle Structural repairs to craft areas 40
Rochdale
Crossgates Primary New classroom 35
Shropshire
Adams Grammar Repair support and facade of main entrance 100
Somerset
Bruton Primary Phase 2: Classroom Extensions 80
Sexey's Science Department development 200
Southwark
London Nautical Boiler and calorifer replacement 140
Surrey
Beacon Expansion of canteen facilities 34
Cheam High New technology block 216
Collingwood External fabric refurbishment 294
Refurbishment laboratory/science block 280
De Stafford Urgent recladding and reroofing 640
Epsom and Ewell IT Development 100
Heathside Refurbishment 3 science laboratories 120
John Fisher Science—Fire, health and safety improvements 200
Manor County First Replace oil with gas central heating 86
Nonsuch High New classroom and re-model science laboratories 335

School Project £ thousand
Send First 3 new classrooms and toilets 210
Stoneleigh First Window Replacement 46
Sutton Grammar Refurbishment 4 laboratories 160
Wilsons Food technology, design and art area 150
Tameside
Audenshaw 2 new classrooms 105
Tower Hamlets
Raines Foundation New science laboratories and ancillary accommodation 450
Walsall
Streetly Roof repairs 87
St. Thomas More New science block 695
Wandsworth
Burntwood Window Replacement and Remedial works 340
Upgrade science classrooms and fire escape 302
Elliott Alteration to science accommodation 300
Warwickshire
Ash Green Replacement of boilers 111
Avon Valley Phase 1: Extension of science and technology facilities and refurbishment 220
Hartshill Rewire whole school 262
Myton Extend and refurbish existing workshops for design and technology 499
Queen Elizabeth (Atherstone) Refurbish laboratory 84
Wiltshire
St. Augustines New technology block 230
Woherhampton
Moseley Park Two new science laboratories and associated facilities 255

Table B
Technology schools initiative 1993–94 allocations for grant-maintained schools
School Amount allocated (£thousands)
Baines School 205
Beacon School 185
Cornwallis School 207
Graveney School 300
Homewood School 176
Manshead School 252
Northolt High School 200
Ravenswood School for Boys 244
Small Heath School 211
Southlands School 223
Stratford School 300
Wymondham College 200

Mr. Byers

To ask the Secretary of State for Education how many parents rang the telephone helpline set up in respect of advice on grant-maintained schools by his Department on 1 February, for each of the first two weeks of operation.

Mr. Forth

During the first weeks of operation, the helpline received 271 calls, of which 214 were from parents. The number of calls received during the second week was 848, of which 674 were from parents. This gives a total of 1,119 calls during the first two weeks, of which 945 were from parents.