HC Deb 17 December 1992 vol 216 c364W
Mr. Home Robertson

To ask the Secretary of State for Defence what Regular Army amphibious engineer capability is to be available in the United Kingdom after 1995; when the current M2 equipment will be replaced by M3 equipment, and at what cost; whether the bridging and ferry equipment currently in service can operate for a fully loaded Challenger main battle tank; and if he will make a statement.

Mr. Aitken

We intend that the Regular Army's amphibious engineering capability will remain in Germany; a Territorial Army capability will be provided in the United Kingdom.

We plan to replace the current M2 bridging equipment with M3 equipment from 1996. As we intend to hold a competition in the near future, the estimated cost is commercially confidential.

The current M2 equipment can carry a fully loaded Challenger I main battle tank. M3 has been designed with this and future tank requirements in mind.