HC Deb 06 November 1979 vol 973 c141W
Dr. Roger Thomas

asked the Minister of Transport what percentage of the time during the past 12 months the two lanes over the Severn bridge have been totally open in both directions.

Mr. Fowler

The two lanes over the present Severn bridge have been totally open in both directions for 73 per cent. of the time during the past 12 months.

Forward to