IN FIRM RPOGRAMME
Scheme Estimated cost
£ million
A470/A458 Cleifion Bridge 0.2
A470 Dolgellau By-pass 2.0
A470 Hendre Fawr-Cefn Galltycwm 0.2
A470 Coed Caeddu, Trawsfynydd 0.1
A470 Llainwen-Trawsfynydd 0.1
A470 Improvement at Teiliau Isaf 0.2
A470 Pont Dolgyfeiliau 0.2
A470 White Hut Maesyrhelmau Dolgellau 0.1
A470 Tyn-y-nant-Maentwrog Road Station 0.1
A470 Improvement at Maenan Abbey 0.1
A487 Caernarvon Inner Relief Road 3.2
A487 Oakley Arms Maentwrog 0.1
A487 Brynmawr-Home Farm Maentwrog 0.1
A487 Capel Craig-A4087 Junction 0.1
A487 Minffordd-Staer Dywyll 0.2
A487 Treborth Hall-Antelope Railway Bridge 0.1
A487 Braichgoch-Corris 0.1
A494 West of Hywel Dda 0.1
A494 Improvement at Cerrig Llwyndion 0.2
A494 Tomen-y-Castell, Llanfor 0.2
A5/A487 Britannia Bridge 5.5
A55 Iron Bridge Penmaenmawr 0.3
A55 Second Carriageway through Aber 0.5
A55 Junction Improvement at Ysguben-Wern Road and Provision of Second Dual Carriageway 0.1
A5 Penlonllan Cartrefle 0.1
A5 Approaches to Holyhead Railway Station Bridge 0.1
A5 Home Farm-Cemetery Bangor 0.1
A5 George Hostel-Antelope Railway Bridge 0.2
A5 Llanfair PG-Penlonllan 0.1
A5 Widening through Valley 0.1
A5 Castell Eden Bends, Gwalchmai 0.1
14.9

IN PREPARATION POOL
Scheme Estimated cost £ million
A487 Port Dinorwic By-pass 2.4
A5 Llanfair PG By-pass 1.3
A5 Gwalchmai By-pass 1.4
A55 Bangor By-pass 4.7
A55 Llanddulas to Llandudno Junction (part) 3.8
13.6

It is not possible to forecast starting dates for most of the schemes. These are dependent on the satisfactory com

OFFICIAL REPORT a list of the trunk road capital expenditure schemes in Gwynedd which are included in his Department's programme for each of the next five years, together with those schemes in the preparation pool to be undertaken beyond the next five years; and if he will identify the estimated cost of each scheme.

Mr. John Morris

The information is as follows:

pletion of statutory procedures, the acquisition of land and the future availability of funds.

Forward to