§ Mr. Brewisasked the Secretary of State for Scotland if he will state, giving the mileage in respect of each, those motorways or lengths of motorways, for which no line had yet been proposed, a draft scheme had been published, a scheme had been made, tenders had been invited, a contract had been placed, which were under construction and which were in use, respectively, as at 30th April.
§ Mr. RossThe information is given in the table below:
170W
TRUNK ROAD MOTORWAYS Miles Line not yet published M74—DRAFFEN-STONEHOUSE (A74)-GLASGOW Maryville-Carmyle 2.8 M9—EDINBURGH-STIRLING Polmont and Falkirk Bypass-Stirling Bypass. 6.2 M90—INVERKEITHING-PERTH Milnathort-Perth Bypass 11.5 20.5
Draft scheme published A8(M)—GLASGOW-GREENOCK Bishopton Bypass Stage II 2.75 Schemes made M9—EDINBURGH-STIRLING (a) Newbridge-Polmont and Falkirk Bypass Stage II. 10.12 (b) Stirling Bypass Stage II 4.08 M90—INVERKEITHING-PERTH Kinross and Milnathort Bypass 7.96 22.16 Under construction M8—EDINBURGH-GLASGOW (a) Dechmont-Whitburn 7.55 (b) Newbridge-Dechmont 6.1 M90—INVERKEITHING-PERTH Cowdenbeath and Kelty Bypass Stage II. 7.23 A8(M)—GLASGOW-GREENOCK Bishopton Bypass Stage I 1.25 A898(M)—ERSKINE BRIDGE TRUNK ROAD Erskine Bridge Link .63 M9—EDINBURGH-STIRLING (a) Newbridge-Lathallan Stage I 2.29 (b) Stirling Bypass Stage I 2.65 M73—MARYVILLE (M74)-MOLLINSBURN (A 80) 6.3 34.0 In use M90—INVERKEITHING-PERTH Admiralty Road flyover to Duloch 1.9 M8—EDINBURGH-GLASGOW (a) Harthill Bypass 5.15 (b) West of Harthill-Newhouse 5.15 M74—DRAFFEN-STONEHOUSE (A74)-GLASGOW (a) Hamilton Bypass Stage I 9.0 (b) Hamilton Bypass Stage II 4.45 A8(M)—GLASGOW-GREENOCK Renfrew Bypass 6.20 M9—EDINBURGH-STIRLING Polmont and Falkirk Bypass 5.37 37.22 LOCAL AUTHORITY MOTORWAYS Miles Tenders invited GLASGOW INNER RING ROAD Charing Cross Section 0.6 Under construction GLASGOW INNER RING ROAD Woodside Section 0.7 Kingston Bridge Section 0.8 In use GLASGOW INNER RING ROAD Townhead Interchange 1.0