HC Deb 09 February 1968 vol 758 c237W
Mr. Swain

asked the Minister of Power what delay he expects in the bringing into operation of the Fawley oil-fired power station; what increases there are likely to be in the estimated capital costs; and what consequential increases there are likely to be on the estimated operating costs of the station.

Mr. Marsh

This is a matter for the C.E.G.B. and I am asking the Chairman to write to the hon. Member.