HC Deb 26 January 1962 vol 652 cc42-3W
Mr. Gresham Cooke

asked the Minister of Transport what schemes under the road programme, costing over £100,000, were started in the six months ended 31st December, 1961; and what are the estimated completion date and total cost of each.

Mr. Marples

The schemes are:

Estimated Completion Date Estimated Total Cost (including land)
£
Classified Roads: Other Urban Areas—continued
Inner Ring Road, Derby Section 3. Construction of dual carriageways and 2 roundabouts. London Road-Osmaston Road. (Derbyshire C.C.) Spring, 1963 186,000
A.505. Widening of Church Street, Dunstable. (Beds. C.C) Spring, 1962 241,000
Classified Roads: Elsewhere
A.412. Dual carriageways Wexham Park Lane to George Green. (Bucks. C.C.) Autumn, 1962 119,000
A.5I. Rugeley-Lichfield. (Widening.) (Staffs. C.C.) Autumn, 1962 113,000
Sandfields Road, Port Talbot. (Glamorgan C.C.) End of 1963 150,000
Liverpool-Warrington Road Diversion (Fords Development)
(i) Lancashire Section dualling between Higher Road A.2562 and Liverpool C.B. Boundary (Liverpool C.B.C. and Lanes. C.C.) Spring, 1962 164,000
(ii) Liverpool Section dualling Lanes. C.C. Boundary—eastern end of Speke Boulevard. (Liverpool C.B.C. and Lanes. C.C.) Spring, 1962 222,000
Turpin Green Lane Extension and Bow Lane Diversion. (Lanes, C.C.) Summer, 1963 123,000
Road 4, Stage 2: Basildon New Town. (Essex C.C.) Early 1963 177,000