HC Deb 26 January 1962 vol 652 c41W
Mr. Pavitt

asked the Secretary of State for the Home Department how many firearms certificates have been granted since 1st July, 1961; and what were the main categories of users to whom these were given.

Mr. R. A. Butler

The information is not available.

Estimated Completion Date Estimated Total Cost (including land)
Motorways £
M.4. Chiswick-Langley Viaduct (Preparatory work) (London-South Wales Motorway). November, 1962 842,000
M.6. South Cheshire Section September, 1963 6,644,000
Wigan South Link (Birmingham-Preston Motorway). June, 1963 454,000*
A.1(M). Major bridges on Darlington By-pass Motorway April, 1963 343,000*
Trunk Roads
A.1. Allerton (Hopperton) Station Diversion, West Riding Summer, 1962 300,000
A.1. Boroughbridge By-pass, North and West Ridings Summer, 1963 1,654,000
A.1. Buckden By-Pass and widening to Buckden Railway Bridge, Hunts. Early, 1963 440,000
A.12. Woodbridge By-Pass Improvement, East Suffolk Summer, 1962 282,000
A.18. Laceby Crossroads to Grimsby Improvement including Laceby By-Pass, Lindsey. Late, 1962 398,000
A.38. Beam Bridge Diversion, Somerset Summer, 1963 135,000
A.40. Ross to Goodrich Cross Improvement, Herefordshire Autumn, 1962 687,000
A.50. Hanchurch Link Road to Birmingham-Preston Motorway, Staffs. Autumn, 1962 422,000
A.63. North Ferriby By-Pass to Welton Improvement, East Riding. Late, 1963 187,000
Classified Roads: London Area
A.40, A.400, B.401. Roundabout at junction of Oxford Street, New Oxford Street, St. Giles High Street and Charing Cross Road (L.C.C.). Spring, 1963 488,000
Holborn, Kingsway. Construction of new road between Theobalds Road and High Holborn. (L.C.C.) Summer, 1963 1,354,000
A.202 and A.3212. Improvement at Vauxhall Bridge. (Northern Bridgehead.) (L.C.C.) Summer, 1962 142,000
A.3036. Widening from railway bridge near Nine Elms Lane to Lansdowne Way, Lambeth-Wandsworth Road. (L.C.C.) Summer, 1962 222,000
Victoria Link Roads with 3 subways. (Associated with the Stag Brewery and Wilton Hotel Development.) (L.C.C.) End of 1963 590,000
Classified Roads: Other Urban Areas
Stoke Road A.322. Reconstruction of bridge near Slough Station. (Slough B.C.) Spring, 1963 202,000
B.274. Widening of Wellesley Road to Park Lane. (Croydon C.B.C.) Spring, 1964 827,000
A.232. Widening of George Street. Altyre Road to Park Lane. (Croydon C.B.C.) Spring, 1964 389,000
Filton By-pass. (Bristol C.B.C.) Autumn, 1963 174,000
A.34. Underpass of the Middle Ring Road, Six Wavs, Aston. (Birmingham C.B.C.) Summer, 1963 753,000
A.38. Inner Ring Road, Section I Holloway Circus Underpass, (Birmingham C.B.C.) Autumn, 1964 1,847,000
A.4058. Widening and improvement of Gefeilon Gardens to Distillery Road. (Pontypridd U.D.C.) Autumn, 1963 183,000
A.483 and B.5131. Grosvenor Street-Pepper St. Junction. Reconstruction and widening. (Chester C.B.C.) Summer, 1962 120,000
Tyne Tunnel. (Northumberland and Durham C.Cs.) Summer, 1966 12,622,000
* Excludes land cost. This is included in the main scheme.

Forward to