§ Mr. Lewisasked the Minister of Housing and Local Government what the total inclusive cost would be to a local authority in borrowing £1,304 in 1951, from the Public Works Loan Board, for the purpose of building a three-bedroom house, on the assumption that the capital and interest was paid back spread over a period of 60 years; and what would be the cost, on the same basis, of borrowing £1,448, the cost of a similar three-bedroom house in 1956.
§ Mr. SandysI would refer the hon. Member to the reply given to him on 31st October last.