HC Deb 24 April 1956 vol 551 c126W
59. Major Anstruther-Gray

asked the Secretary of State for Scotland for how many days the main road over Soutra Hill has been totally blocked and partially blocked by snow during each of the last three winters.

Mr. J. Stuart

In the winter of 1953–54 the road was not blocked at all; in 1954–55 it was totally blocked for 2½ days and open to single lane traffic only for 11 days; in 1955–56 it was blocked on two occasions for about 1½ hours each by vehicles which got into difficulties during snow clearing operations.

Back to
Forward to