§ 73. Commander Maitlandasked the Minister of Fuel and Power what is the normal working electrical load of Battersea Power Station at 11 a.m. and 11 p.m.. respectively, during the winter months.
§ Mr. ShinwellThe normal winter loads on Battersea Power Station at 11 a.m. and 11 p.m. are 260,000 kw. and 240,000 kw. respectively.